Finish two things, not seven
The only operating change that has ever worked for me twice
I have tried most of the systems. The one that has survived contact with reality more than once is embarrassingly simple: cap how much is in flight, and let the queue be visibly long rather than invisibly long.
The arithmetic is not a matter of taste. Work arriving at some rate, and a limited number of hands, produces a lead time that depends on how much you are holding, not on how fast you are going. Hold seven things and each one waits behind the other six. Hold two and each one waits behind one. Same hands, same arrival rate, and the finished count barely moves, but the time from asking to getting collapses.
Everybody nods at this and almost nobody does it, because the cost is not operational, it is social. Holding two things means saying, out loud, to somebody you like, that their thing is fifth. A long visible queue looks like failure. A long invisible queue looks like enthusiasm. Managers are rewarded for the second one right up until the quarter ends.
The tell that an operation has this problem is not a missed deadline. It is that everything is ninety percent done. Ninety percent is where work goes to sit. It has absorbed all its cost and returned none of its value, and it will still be ninety percent in three weeks, because nobody is assigned to the last ten percent of anything, they are assigned to the first ninety of the next thing.
So: cap it. Write the cap on the wall. When somebody asks for an eighth thing, the honest answer is not no, it is which of these two should stop. Nine times out of ten they look at the list and withdraw the request themselves, which is the queue doing your negotiating for you.